Reception area from the rear elevation giving an indication of the extent of the atrium wall panelling which extends from the Basement Lift Lobby to the roof at Level Six, nine floors in total. Solid Oak boards overlapped, secret fixed, incorporating five, full floor to ceiling height windows.
A phased handover necessitated detailed programming and sequencing of works to ensure that the client occupied specific areas on the agreed dates.
Working closely with the Site Manager and his staff Jordan Carpentry Ltd. overcame numerous problems to ensure that the finished product was of the highest standard and that all parties concerned with this project were satisfied with the quality of our workmanship.